High nails are very common from inexperienced James Hardie installers, because they think the nails can go anywhere above the nail line. DuPont Tyvek Fluid Applied Flashing and Joint Compound+ 28 oz, 3.5 gal DuPont Sealant for Tyvek Fluid Applied System* 28 oz Installation Accessories Product Type Quantity DuPont Tyvek Tape 3" Bulk Pack 24 rolls/case DuPont Tyvek Wrap Cap Screws 2" dia. StowasanExteriorInsulationandFinishSystemspioneer-introducingStoTherm toEuropein1963 . 3.repair minor holes with dupont tyvek tape. Vertical grid lines have been provided every 8" on DuPontTyvekCommercialWrapto assist in alignment with stud spacing. . pressboard. Commercial Mechanically Fastened WRB Installation . Fasteners for Tyvek will follow standard installation Depending on time foam is installed, Tyvek . Fastener spacing should be followed per the applicable guidelines of the WRB of choice. The lath and lath attachments must be made of corrosion-resistant material. Allows trapped moisture to escape from wall. 4 " 1000 12"x 12" x 14" 14.5 lb Product Guarantee DuPont will replace any Tyvekproduct damaged during installation by weather or normal handling if it is installed according to procedures published by DuPont. They put a Tyvek membrane under the bottom jamb to keep water out. However, this estimate may vary slightly, depending on the house elevation. Overlap the Tyvek rolls by at least 6 inches (30 cm). drilling screw.-Minimum of 5 threads beyond the combined thickness of the siding and steel stud framing.-Minimum steel framing thickness of 0.032 inch (8 mm) or 20 gauge. The problem with housewraps, and building papers to a lesser extent . Fasteners should be spaced no closer than 6" and no farther than 18" on vertical stud lines. DuPontTyvekWeather Barrier Commercial Installation Guidelines Installation Instructions SteP 1 A. Maximum allowable deflection, based on stud properties only, L/360. a Note: Does not apply to vertical siding. Tape over the side jambs. Space fasteners 8 in. Secure DuPont RainVent Battens in place with 1" crown, 1-1/4" long staples at 16" on center or other approved fasteners capable of penetrating the studs by ". 316 should be used in moist and humid climates, while 304 works best in dry climates. Fastener choices include the following: galvanized coated chisel point staples with a 1/4 maximum crown. These sheets are non-woven and non-perforated and are manufactured by the material being flash spun-bonded using heat and pressure to create sheets of various sizes. For heavier material such as gage steel, the metal roof purlins spacing length could go up to 4 feet. Built in spacing provides a 1/8" - 3/16" gapping. Tyvek fasteners secure pages, regardless of thickness. along alternating edges the length of the board. 76 Series Strand Substrate lap must be fastened with:-Stud spacing a maximum spacing of 24 inches (610 mm) o.c.-Minimum #8 hot-dip galvanized, tapered head, self- The fastener pattern and insulation thickness determines the maximum allowable wind load. spacing between the centers of fasteners of three times the nominal diameter of the screw, and a minimum distance from the center of a fastener to the edge of any connected part of 1.5 times the nominal diameter of the screw. Note: Optional surface preparation utilizing a rainscreen may be added. These ties are used to connect multiple wythes of masonry, often of different materials; anchor masonry veneer to backing systems Vertically overlap the next sheet of DuPont Tyvekby at least 6". Install beneath the exterior siding to reduce air infiltration and water penetration. HardiePanel vertical siding must be joined on stud. galvanized coated ring shank underlayment nails with a 3/16 diameter head. STUCCO ** Engineer review recommended for existing stucco. Tyvek fasteners secure pages, regardless of thickness. Over time, ties of various sizes, configurations and adjustability have been developed for loadbearing masonry, cavity walls and brick veneer construction. B. STEP 3 Secure DuPont Tyvek WRB to the stud or other nail-base material i.e wood sheathing. Fasten the T1-11 siding to the studs with galvanized nails or exterior grade screws. Both the 2003 International Building Code (IBC) and the Western Wood Products Association require that solid wood siding products be nailed directly into studs or 2x blocking. Fastener Type: 7/16" crown staples / 18 gauge. Locate fasteners at least 3/8" (9 mm) from the ends and edges of the sheathing. Tapcon Concrete AnchorsTapcon is the #1 recognized screw anchor brand in the industry. Corrosion Resistant Screws Ribbed Bugle-head or equivalent (No. JOINING Fill joints with latex-fortified mortar or Type 1 organic Fastener placement: 3/8" from ends and edges, when framing support allows. patent #5407313. B. (32 mm) USG Durock Brand Tile Backer Screws for wood framing or equivalent. Stainless steel and aluminum fasteners repel rust and last for long periods of time. Select a Site ITW Brands EZ Ancor GRK Paslode Red Head Tapcon Backer-On Rock-On Teks Pressboard Report Cover with Tyvek Reinforced Hinge, Two- Piece Prong Fastener, 3" Capacity, 8.5 x 11, Black/ Black. is still wet. Fastener Capacity: 200 caps / 200 staples. Fasteners for Tyvek will follow standard installation Depending on time foam is installed, Tyvek . Because the screws would be just slightly countersunk, I settled on 2 screws for the 2 1/8 fastener length for the boards and 3 for the battens. Some call for fasteners spaced as wide as 32 in. Tyvek fasteners secure pages, regardless of thickness. Cap Type: Full 1" plastic collated caps. Manufacturer: ACCO Catalog: eCatalog Catalog page: N/A Technical Specs: Global Product Type Report Covers-Tang/Prong Binding . Tyvek fasteners secure pages, regardless of thickness. A Tyvek Homewrap's exterior cladding, final fasteners, and securement take several weeks to install fully. 7 . For midway locations, the fastener spacing must not exceed 16 inches (406 mm) on center and fasteners must be located within 16 inches (406 mm) of the horizontal edges. (2D) Electro Galvanized Ring Shank Nail with Plastic Cap (3000-Count) Use PRO-FIT cap nails to secure building Use PRO-FIT cap nails to secure building envelope and better protect roof decks and sidewalls from moisture. This may involve penetrating bandboard or other horizontal members to maintain proper spacing. Spacing Between Anchors - Shear 1/4 4 2 0.82 4 2 0.81 Edge Distance - Tension 1/4 2-1/2 1-1/4 0.82 4 2 0.88 Edge Distance -Shear 1/4 3 1-1/2 0.59 4 2 0.80 For SI: 1 inch = 25.4 mm. I will try to put as much housewrap on exposed areas as possible. The table below should be used as a guide for determining fastener patterns: EPS Thickness (Inches) Fastener Pattern Pressure & Failure (PSF)1 1 in (25 mm) A 70 For fasteners with cap/washers greater than 1", one fastener can be . The following materials comprise the wall (in application order from the stud face): 1/2" OSB, 1-1/2" Rigid Insulation, Tyvek, 3/8" x 2" Furring Strips, Lap Siding. (38 mm) 11-gauge hot-dipped galvanized roofing nails, or 1-1/4 in. Make sure to cover the entire wall surface thoroughly, or air and water protection could be significantly reduced. Wood framing and 1-1/2 in. The fastener spacing patterns vary widely between manufacturers. The fastener spacing must not exceed 24 inches (610 mm) on center along the EPS edges. NOTE:It is important that proper shingling is maintained. Tapcon Screw Anchor - Technical Data Ultimate Tension and Shear Values (Lbs/kN) in Concrete . When screws are used to attach panels to steel studs/furring, the screws shall have wing tips. Remember to wrap the material starting low and work your way up to ensure proper material overlap (as shown in the vid. If you have any questions, call DuPont Tyvekat 1-800-448-9835. Use portable scaffolding, not a ladder, when covering Tyvek over high areas. A. While the finishing touches are not yet installed, they could get damaged. 2 Stoistheinnovativeworldleaderincladding,coatingandrestorationsystems. I'm looking to install the Tyvek over the rigid as more of a water drainage plane . (Tyvek and Typar are two common examples) or building paper (#15 or #30 tar paper) isto drain rain that pene-trates the siding through leaky joints or capillary action. Color-matched Tyvek-reinforced hinges ensure a long life. Has stucco really advanced or have regulations taken us to this Manufacturer: ACCO Catalog: FC Greencastle-GPA-098 Catalog page: N/A Technical Specs: Global Product Type Report Covers-Tang/Prong Binding . Leave enough lap to ensure a minimum 6" overlap of the WRB on all sides except top of the wall. Waterproofing If waterproofing is desired, use USG Durock Tile Membrane or USG Durock Brand Waterproofing Membrane. When finished will cover everything with stucco netting paper/mesh right after applying housewrap and then stucco finish it. Install the window plumb, level, square, and centered in the opening. Move to the opposite edge of the . DuPont Residential Fasteners builDing science bulletin Performance in the details: DuPont tyvek Wrap cap staples DuPont tyvek Wrap cap staples are recommended to increase holding power and reduce tears when fastening DuPont tyvek Weatherization systems. These caps are engineered to increase fastener holding power, reducing the potential for job-site tear-offs. Note: If the metal lath flexes when pressed, insert more fasteners. Tyvek rolls are slippery and large, so secure footing is highly recommended when handling them. Siding boards: DeckMate 2 #8 Star bit flat-head deck screws. Space the fasteners a maximum of 16" (406mm) apart for horizontal siding panels, every 12" (305mm) for vertical siding panels, and every 8" to 12" (203mm to 305mm) for accessories. Fastener spacing is not more than 16" O.C. There are two types of stainless steel fasteners available, 304 and 316. The "wings" on each CONCEALoc Fastener insert into side grooves in adjoining Deck Boards. Starting at a corner of the building unroll DuPontTyvekweather barrier keeping the roll plumb. Most house wrap manufacturer installation instructions have minimum horizontal overlaps of 4-6 inches and minimum vertical overlaps of 6 -12 inches. 5.interior vapor retarder may be required in some regions. Extend approximately 12" past either the inside or outside corner of the wall. Avoid over-driving . The fastener spacing must not exceed 24 inches (610 mm) on center along the EPS edges. Can Also Have A Reverse Lap When Used As An Air Barrier Tyvek Homewrap can also create reverse laps when used as air barriers at the seams. for ceiling applications. Pneumatically applied The Spotnails Crossfire cap stapler is ideal for use with It is likely that the lumber will be well air-dried within the 30 days, or mid August. This environmentally safe sterilization alternative uses low-temperature gas plasma to avoid the degrading effects of steam or the residues of EtO. DrainWrap or Tyvek CommercialWrap D and fastened to the sheathing along the EPS edges and midway between the horizontal edges. Pressboard Report Cover with Tyvek Reinforced Hinge, Two- Piece Prong Fastener, 3" Capacity, 8.5 x 11, Light Blue/ Light Blue. On wide boards (12" or wider), put 2 nails about 2 to 3 inches apart in the middle." There is some argument on whether battens should be 2" or 3" wide. . Fasteners consist of wood screws sized to meet wind resistance requirements, with minimum 1 3 These flaps allow for a DuPontTyvek-to-DuPontTyvek seal with adjacent sides. For more information visit building.dupont.com or call 1-866-583-2583 Fasteners should be driven flush with the panel surface (not countersunk) and into the framing system. metal lath meeting IBC Section 2510.3 (ASTM . Self-furred 2.5 lb. If you can easily fit your hand underneath your Hardie siding, 9 times out of 10 that's because the installer didn't nail the boards properly. Pressboard Report Cover with Tyvek Reinforced Hinge, Two- Piece Prong Fastener, 3" Capacity, 8.5 x 11, Light Blue/ Light Blue. Tyvek products include:. (both directions) min. The STINGER CS150 is designed for use with: Also replaced sill plate and rim joist. Pros of the ZIP System a. Build your dream deck with Trex, the world's best high-performance composite decking brand. . slider closed. Skip caulk the bottomleave two-inch gaps every six inches or so to make weep gaps for drainage. Fastener Length: 7/8", 1-1/4", 1-1/2". Bricks, Masonry, Cinder Block, Paving & Walking Stones, Asphalt and Concrete - Stucco over OSB and Tyvek - Noticed the older threads mention stucco w/ chicken wire, while anything recent insists on self furring mesh with 6 inch spacing on fasteners. C926 andASTM C1063); IRC Section R703.6.1 For proprietary Ring shank nail (0.148 min . seCtion 1 exterior Wall drainage requireMents 1 Water-resistive Barrier and drainage requirements as defined by building code. Screw Length and Size for My Board and Batten Siding Install. . the size, spacing and type of ties have been entirely empirical. Batten boards: DeckMate 3 #9 Star bit flat-head deck screws (38.1 mm) fastener penetration into the structural framing. OSB costs roughly $6 a sheet of 4 x 8 sheathing. dia.) an hour by a skilled contractor, for an installation cost of roughly $490 for 500sq.ft. 2. K02138 01/04 PRODUCT SPECIFICATIONS SPIRAL SHANK RING SHANK DuPont Tyvek Wrap Caps for all types of construction: PRODUCT GUARANTEE:DuPont will replace any Tyvek product damaged during . When a pneumatic fastening system into metal is used . The CONCEALoc Hidden Fastener System is designed for installation of edge-grooved planks, ensuring a smooth, safe, and attractive deck surface. Maximum fastener spacing: 8" o.c. For face nail application of 9 1/2" wide or less siding to OSB, fasteners are spaced a maximum of 12" o.c. Fasteners secure all pages. for wood and steel framing; 6" o.c. Double stud may be required to maintain minimum edge nailing distances. DrainWrap or Tyvek CommercialWrap D and fastened to the sheathing along the EPS edges and midway between the horizontal edges. The brick ties must be installed with-in 24 hours of the Tyvek installation. This fastener is going to be the shortest fastener approved for fastening lap siding products, therefore the furring must be a minimum of 0.75" thick to achieve the same values as NER-405 Table 2 states for the 11 ga. 1-1/4" roofing nail given plank reveal, stud spacing, building height and exposure category." The document also states: Position fasteners 3/8 in from panel edges and no closer than 2 in away from corners. Vertically overlap the next sheet of DuPont Tyvekby at least 6". along the length of the board, or with additional fasteners spaced a max. around the perimeter and in the field of the board. Also replaced sill plate and rim joist. They put a Tyvek membrane under the bottom jamb to keep water out. These distances may be increased if the manufacturer permits greater spacing based on wind load testing. 6. This is a basic rain-screen wall system, and was also detailed in the Feb/Mar 2001 FHB issue. Plastic panel, apron or spandrel walls as UV protected for up to 9 months of exposure. DuPont Tyvek WRBs can be installed using a variety of fasteners, and will depend on the application. The 1" cap provides greater holding power than a nail or staple alone, making them a viable option for residential and commercial settings. Tyvek Water-Resistive and . Ring-shank nails should penetrate 1-1/4 inches into wood (combined sheathing and stud) and smooth-shank nails 1-1/2 inches. DuPont Tyvek Wrap Caps (1-inch diameter) are made exclusively for DuPont by National Nail Corporation, Grand Rapids, MI 49509U.S. Model # 59150. Old stucco below metal weepscreed in picture has . How many rolls of Tyvek WB are required for a typical two-story house? I will try to put as much housewrap on exposed areas as possible.

tyvek fastener spacing 2022